1. Increased fuel consumption: The damage of the ternary catalyst is damaged, which directly causes the fuel consumption and the power decreases.
2. Don’t meet the standard: noise, pollution environment, and the annual inspection cannot be over. If there is a vehicle with a driving computer (commonly known as ECU), the oxygen sensor will fail after damage, which may cause oil supply failure. 3. The engine jitter fault light is on: If the function failure of the ternary catalyst will cause the tail gas emissions to exceed the standard. The OBD engine control system will light up the discharge fault light.
4. Power decrease: The common failure of the ternary catalyst is blocking and function failure.
5. The exhaust is not smooth and odor: When the total speed or acceleration can be smelled, the smell of the pungent and stinky smell can be smelled. For tail gas analysis, it will be found that the nitrogen oxide compound (NOX) is seriously exceeded, and it should be cleaned in time.
The three-way catalytic converter of DJN meets the following conditions
Product name | Universal three way catalytic converter |
Model Number | DJN0423 |
Brand Name | DJN |
Emission Standard: | EURO 2/3/4/5 |
OE NO. | ~ |
Year: | ~ |
Car Fitment: | Universal three way catalytic converter |
Overall length (mm) | 416.052mm |
Inlet/outlet Diameter (mm) | 2''/2.25''/50. 8mm/57.15mm |
Material | Inside : ceramic(honeycomb) substrate 400cpsi with mat |
Shell :304 or 409 # stainless steel shell,stainless steel pipe | |
Oxygen sensor ports | NO |
cpsi | 400 /600/800 |
Wall thickness | 0.09±0.025 |
Warranty | 30000 miles performance/2 years |
Packaging: | Air bubble film and Carton Packing |
MOQ: | 50 pcs |
Supply Ability | 1000 Piece/Pieces per Week |
Place of Origin: | Jiangsu |
SAMPLE ORDER: | Accept |
Condition | new |
Function | reduce harmful emission (CO,HC,NO) from motor vehicle Over 95% conversion efficiency; |
Service | Customers' specific demands available, design drawings are welcomed. OEM service is accepted |
Supply Ability | 1000 Piece/Pieces per Month |
Packaging & delivery | Air bubble film and Carton Packing, inside fix the product decently with expanded material |
Port | Shanghai/Ningbo |
Lead time: | 10-30 days . |
Active catalyst ingredients | Pt, Pd, Rh, and rare earth elements |
Shape | round, oval, race track |